Where did the time go??? (3 months)
Small update!
I would like to finish ballasting the main loop. I need to get the epoxy poured before I can do that. Mainly removing bridges for easier pour! I selected as in above post; an epoxy resin out of Calgary Canada. I was worried about an exothermic reaction and would melt foam board. I did test pour and Good news! No problems so far.
I’ve kicked the idea of an open house via a group called Rte. 30 Express tour. Basically modelers open their homes for the model train enthusiasts to check out some layouts. I expressed if I could be added to that list. It’s November 23rd, so I’ve got work to do!!! I need to get it there (viewing ready). Here’s a pic of my test. Not dramatic lol! We pour tomorrow!!!!