There is also a very important wiring issue to think about when planning either a lift-out or raise-up bridge. You must have a long enough section of track where power is killed BEFORE entering the bridge if the bridge is UP or MISSING. The obvious reason is to prevent trains from meeting the floor below the bridge or actually crashing into a raised bridge (for raise-ups).
Just a little more to plan for as you proceed.