More testing with full trains on the layout.
Ran 4 passenger trains with no problems.
Had some electrical conductivity problems in the new passenger yard. Some turnout points weren't making contact with the stock rails. Used a dental pic to lift up those small brass contacts under the points so they would contact the stock rails.
My power checker verified all was good again!