SP AC-1 2-8-8-2 (CONT):
Decoder install:
Soldered the other side of the connectors for the wires that route through the boiler.
Soldered the tender light and sugar cube speaker in the tender.
Stuffed all the wires in the tender and 'closed it up'.
Marker and headlight glued in.
Two of the four running board lights glued in the boiler.