Skip to main content

Reply to "Great Northern railway"

GNRW OPS for December plus PM a railroader's engines.

Paul brought his PRR sharknose diesel and Ben brought his kit built freight cars.

Videos:

Paul's PRR sharknose diesel freight train:

Departing Seattle:

https://www.youtube.com/watch?v=FRSbW_LlEog

Havre:

https://www.youtube.com/watch?v=aOQE8qZaisM

N&W A 2-6-6-4 freight at Havre:

https://www.youtube.com/watch?v=SHJ0CZzicPo

PRR P5A electrics freight departing Whitefish:

https://www.youtube.com/watch?v=ybUebY79NU4

NP A-3 grey boiler 4-8-4 with some of Ben's freight cars:

Departing Willmar:

https://www.youtube.com/watch?v=Zm7EZZiSmCg

Hillyard:

https://www.youtube.com/watch?v=i7UgkHPL2Hk

Burlington Zephyr departing Whitefish:

https://www.youtube.com/watch?v=4IR2pvu_5yM

Just the 3 of us.  Joe was at his club's layout display so I did the 'dispatching'.

Figured attendance would be 'light' being just before Christmas but only need one to have a 'good time'.

Usual pizza before operating.

Ben's kit built freight cars.

GNRW OPS 12-21-2024 01

GNRW OPS 12-21-2024 02

GNRW OPS 12-21-2024 03

Plus his tank.

GNRW OPS 12-21-2024 04

Paul brought his PRR sharknose diesel.

GNRW OPS 12-21-2024 04A

GNRW OPS 12-21-2024 05

Plus his 'printer generated' freight car.

GNRW OPS 12-21-2024 06

Amazing detail the 'printers' produce.

GNRW OPS 12-21-2024 07

PRR sharknose diesel departing Seattle.

GNRW OPS 12-21-2024 08

GNRW OPS 12-21-2024 09

Marias pass.

GNRW OPS 12-21-2024 10

Tumwater canyon trestle.

GNRW OPS 12-21-2024 11

PRR P5A electrics at Havre.

GNRW OPS 12-21-2024 12

NP A-3 grey boiler 4-8-4 at Willmar.

GNRW OPS 12-21-2024 13

GNRW OPS 12-21-2024 14

Ben and Paul.

I failed a couple times trying to 'dispatch' and take videos at the same time!

GNRW OPS 12-21-2024 15

Ben operating the NP A-3 grey boiler 4-8-4.

GNRW OPS 12-21-2024 16

Paul 'switching' at Seattle.

GNRW OPS 12-21-2024 17

Basement Christmas tree.

GNRW OPS 12-21-2024 18

This N&W Y-3 2-8-8-2 had a 'valve linkage' failure!

GNRW OPS 12-21-2024 19

One of the 'valve linkage' screws 'fell out' and I 'actually' found it!

With 1500' of railroad, I figure the odds were pretty slim!

GNRW OPS 12-21-2024 20

============

A few days ago a railroader's motive power wasn't 'working'.

Easy fix on the programming track by inputting new engine addresses.

GNRW OPS 12-21-2024 21

Attachments

Images (22)
  • GNRW OPS 12-21-2024 01
  • GNRW OPS 12-21-2024 02
  • GNRW OPS 12-21-2024 03
  • GNRW OPS 12-21-2024 04
  • GNRW OPS 12-21-2024 04A
  • GNRW OPS 12-21-2024 05
  • GNRW OPS 12-21-2024 06
  • GNRW OPS 12-21-2024 07
  • GNRW OPS 12-21-2024 08
  • GNRW OPS 12-21-2024 09
  • GNRW OPS 12-21-2024 10
  • GNRW OPS 12-21-2024 11
  • GNRW OPS 12-21-2024 12
  • GNRW OPS 12-21-2024 13
  • GNRW OPS 12-21-2024 14
  • GNRW OPS 12-21-2024 15
  • GNRW OPS 12-21-2024 16
  • GNRW OPS 12-21-2024 17
  • GNRW OPS 12-21-2024 18
  • GNRW OPS 12-21-2024 19
  • GNRW OPS 12-21-2024 20
  • GNRW OPS 12-21-2024 21
Last edited by samparfitt
×
×
×
×
×