Skip to main content

Reply to "Great Northern railway"

GN O-8.

Lead weight added over motor and gear box.  No glue needed over motor as the lead is easily pushed into the sides and friction holds it in place.  The lead over the gear box had to be cut in half to get into such a small area so some wood glue used to 'spot' glue the lead to the boiler.

GN O-8 2-8-2 open cab 21GN O-8 2-8-2 open cab 22

Back on the road!

GN O-8 2-8-2 open cab 23GN O-8 2-8-2 open cab 24

Tender:

GN O-8 2-8-2 open cab 25

Made by Samhongsa, this engine has an incredible amount of detail.

GN O-8 2-8-2 open cab 26GN O-8 2-8-2 open cab 27

Attachments

Images (9)
  • GN O-8 2-8-2 open cab 17
  • GN O-8 2-8-2 open cab 18
  • GN O-8 2-8-2 open cab 21
  • GN O-8 2-8-2 open cab 22
  • GN O-8 2-8-2 open cab 23
  • GN O-8 2-8-2 open cab 24
  • GN O-8 2-8-2 open cab 25
  • GN O-8 2-8-2 open cab 26
  • GN O-8 2-8-2 open cab 27
×
×
×
×
×