Skip to main content

Reply to "Help wiring my layout eh"

Pine Creek Railroad posted:

Chester,

   There are many different engineering methods when building a DCS/Legacy layout Carl's is a good one, especially for the larger layouts.  Modify your building methods for the layout you are engineering, over head layouts need to be constructed light and engineeringly strong for longevity operation.  Also it is nice to have the over head layout blend into your Train Room, as you see in the picture below, it makes the Train room look neat and professionally built.   As Karl points out engineering planning is important.

PCRR/Dave

The Pine Creek Rail Road under construction in the new Train Room/Bar.

DSCN2393

Thanks   Ya I won't have to worry about strength I build everything way overkill but thats how we roll I wish I knew as much about this wiring as I do building and fabricating eh lol

×
×
×
×
×