Skip to main content

Reply to "Layout Progress...Never too late!!! "Backdrop installed the HARD way" 1/11/25"

Hi Everyone,

The dimensions of the layout are approximately 25' X 15'. It is an around the room plan which currently features a 6-track yard. The layout has a two track mainline (lower level) and a single loop branch line(upper level). I use Atlas 3 rail track. The layout is not based on any particular area and is freelance. I would venture to say, because of my preferences, the era of the layout would be from the transition era to the present. I know, how do you model that? Big gap, I know, but I like the new and old. 

I mostly use diesel power but have started to become more fond of steam power. 

Here are some random pics of the layout. I also have a couple of videos on Youtube under luvindemtrains.

I also have included the print out of the track plan but there have been a few modifications made to that. Most notably in the upper level (branch line). The three track spur section, to the right, has been re-installed on the lower level. I could not justify keeping it on the upper level. Currently this area is where I have an engine servicing facility but plan to cut through the wall and continue the layout in the adjacent room. When that project begins I will post it step by step. 

Thanks,

Dave

Attachments

Images (14)
  • Original Layout Design: Basic Track Plan
  • 193: Fascia Installed but not stained.
  • 196: Fascia Installed and stained.
  • 002: Pre-painted gorge area.
  • 007: Another view of unpainted gorge area.
  • 024: This is after the new bridge was installed and before any backdrops were installed and before I painted the benchwork.
  • 043: another view of bridge area.
  • After Paint and New Bridge: Bridge and steel mill backdrop.
  • Canyon #1: Semi-finished gorge area. Several details including finishing the river have to be done.
  • Canyon #2: Another view of the gorge and its forced perspective.
  • Backdrop Installed #1 (right side): My first try at backdrop installation. My vaulted walls made this project interesting. Thanks for all of the suggestions I received.
  • Painted Benchwork #1: Left side of layout after benchwork was painted. The town will be located here.
  • After Paint and New Bridge #2: To the right is the section that leads to the engine servicing facility and that will eventually go into the next room.  You can see a section of the steel mill backdrop behind the bridge.
  • Painted Benchwork #2: This is another section of the left side of the layout.
Last edited by luvindemtrains
×
×
×
×
×