Modular is the way to go. I have 15 modules all electrically isolated, but I cannot lift them to work under. I use Conch Jones connectors for electrical connections between modules. The problem is isolating the track. I have totally disconnected inter-track connections in the past and have had alignment issues, so now I use plastic rail joiners.
![]() ![]() ![]()
![]() ![]() ![]()
![]() ![]() ![]()
![]() ![]() ![]()
|