Skip to main content

Reply to "Blackwater Canyon Line - April 2, 2025, Brick Street Extension Planning"

Thank you, Steve, Firewood, and Pat!

Yes, I have trouble putting down on paper what I am thinking of in three dimensions.  Maybe it is from my early training in drafting, where I did fine on each side view, but the isometric drawings were always a challenge.  Fortunately, when I went into electronics, I was just doing schematic drawings and front views of equipment panel layouts.  This was all with T-square and triangle on vellum or mylar.  (Yes, the Dark Ages)    I had a time of it trying to make a drawing for DoubleDAZ Dave to see what I had in mind for the town on the hill.

The timber pier purchase was a surprise.  We have a gift shop in the little shopping center near us.  Greater Butler Mart.  What an ambitious name for a town of 13,000, but it was state of the art back in 1960 when it opened.  Back to the gift shop, the lady has a lot of trains in the shop.  They are mostly from the MPC era and up to, but not including any command control.  Anyway, there was this K-Line box there brand new without any of the inner wrapping open.  She wanted $20 for it, and I realized it was just the ticket for a stand in until I can come up with a more permanent arrangement, which I plan to be long after I do scenery work behind it.  I do plan to paint it to make it a little more realistic looking.

You are right, I am itching to get a train running around the whole layout.  Now the two challenges will be:

1. To get the wiring in so I don't have to move alligator jumpers everywhere.

2. Receive my small order from Mianne to complete the last leg (literally) of the table.  I sent the order and paid Tim already.  (I could build it up with a 2x4 as the missing leg and swap in the Mianne leg and I-beams if he is too backlogged.)

3. Build the lift up bridges and electrical work in so I don't have any accidents.

×
×
×
×
×