Skip to main content

Reply to "Blackwater Canyon Line - April 2, 2025, Brick Street Extension Planning"

Last evening I made a first run on the layout with a temporary lift out bridge handling the opening to the center and the temporary trestles.  Here is the liftout as RSJB18 Bob suggested.

2020-07-07 20.08.12

Here are a couple views of the layout, one from the door and the other from the window over the washer and dryer.

2020-07-07 19.23.382020-07-07 19.24.24

Here is the first run video running an MTH Premier SD40-2 and Lionel caboose.  Later in the evening I switched in the 5 hoppers on the siding but didn't video.

Attachments

Images (3)
  • 2020-07-07 20.08.12
  • 2020-07-07 19.24.24
  • 2020-07-07 19.23.38
×
×
×
×
×