Thank you Dave, Keith, Dave, and Dave!
It is good to get to this point, even though there are a lot tweeks that need done to the track and wiring. I checked out moving trains from main to passing siding, and back on the lower level and it works good. I haven't done that on the upper level yet. You can see switches in for the spurs, but no track for the spurs yet.