Skip to main content

Reply to "Blackwater Canyon Line - April 2, 2025, Brick Street Extension Planning"

Thank you Dave, Keith, Dave, and Dave! 

It is good to get to this point, even though there are a lot tweeks that need done to the track and wiring.  I checked out moving trains from main to passing siding, and back on the lower level and it works good.  I haven't done that on the upper level yet.  You can see switches in for the spurs, but no track for the spurs yet.

×
×
×
×
×