Skip to main content

Reply to "Blackwater Canyon Line - April 2, 2025, Brick Street Extension Planning"

Dave NYC Hudson PRR K4 Dave, Thank you!!  Once I got the main line in I would have started scenery because that is my favorite part of the hobby, besides running trains.  However, I wanted to see how these sidings would fit in, so I might as well get the track down.  Also, I wanted to get the yard in and make sure I could get the wye and enginehouse in since it was an afterthought.  I am looking forward to working on scenery.

Pat Kn Pat, Thank you!!  I worked for 43 years, mostly as an electronics technician, but the last 10 years as a network engineer.  I have crawled into so many tight spots and underneath desks, tables, and cubby holes, and up in ceilings over the years, that I don't like going under the layout.  I am like you, I don't want to go under the layout even though it is fairly high at 44 inches.  That is why I didn't power up the mainline permanently yet.  I have a good adjustable roll around stool now that helps.  I think I will work on the wiring in stages as I work on scenery to break up the time under the layout.

Last edited by Mark Boyce
×
×
×
×
×