Skip to main content

Reply to "Blackwater Canyon Line - April 2, 2025, Brick Street Extension Planning"

@Aegis21 posted:

Nice Work Mark!  Great ideas with the electrical center and having display shelves. Looking forward to how you wire the layout.

Thank you, John!!  Yes, I have all the wires connected to each insulated track section and pulled back to the "nerve center".  I'll definitely describe what I am doing when I start mounting everything anc terminating wires.  I'll be looking for someone to catch me on the way and suggest a better way since I will be using all products I never used before. 

×
×
×
×
×