Skip to main content

Reply to "Blackwater Canyon Line - April 2, 2025, Brick Street Extension Planning"

@Mark Boyce posted:

Thank you, John!!  Yes, I have all the wires connected to each insulated track section and pulled back to the "nerve center".  I'll definitely describe what I am doing when I start mounting everything anc terminating wires.  I'll be looking for someone to catch me on the way and suggest a better way since I will be using all products I never used before. 

Mark, the layout looks awesome!  The part where wires are getting pulled is my least favorite.  I was doing plenty of crawling around on my hands and knees on the concrete floor last weekend.  I'm not "old" in the "model railroader" sense, but I'm definitely feeling that concrete floor for a couple days after.  And I still have lots to do.

Jeff

×
×
×
×
×