Skip to main content

Reply to "Blackwater Canyon Line - April 2, 2025, Brick Street Extension Planning"

Wow, so the aluminum looking cylinder under the bridge area lifts the bridge? And lowers the bridge to? Cool deal. When raised up, does this give you enough room to walk inside the layout with ease? You and Mike g. are so clever. My bridges are lift ups and outs by scooting the track connecting slide shoes all the way off the Atlas O double girder bridge and the MTH bridge, with the bridges completely off, then the entire scenic detailing is on a rolling platform that comes out of the layout and is rolled out of the way, then I have a platform to stand on and work on the middle of the layout. I wish I had seen these ideas 15 years ago. Great woodworking, great thread. Just for the record, we have snow to shovel, it’s time to go to work. Happy Railroading Everyone

×
×
×
×
×