Skip to main content

Reply to "Blackwater Canyon Line - April 2, 2025, Brick Street Extension Planning"

I finally got both my lift up bridges working.  I am following Mike g.'s design.  I'm very thankful he shared drawings and photographs with me.  I have not done any wiring yet.  The linear actuator is powered by my old Lionel DC Type 0100 variable DC power supply I bought to run my HO train back in the late '60s.  In the video I am holding the smart phone camera and controlling the supply so I don't crash into the ceiling.  I have not turned the track power on since I started this project, so don't worry about crashing trains into the gorge.

2021-03-05 10.32.27

I mounted the Atlas Pratt Truss bridge following a video by Eric Siegel from 2008.  His was not motorized, but I used the same setup for the hinges and the alignment on the other end.    I would have liked the piers for the Atlas Pratt Truss bridge to be not so hefty, but thought I should make them that way to give good support and make a logical base for the hinge mounts.

2021-03-05 10.32.162021-03-05 10.32.082021-03-05 10.31.462021-03-05 10.29.572021-03-05 10.29.44

Next up will be wiring power, limit switches, and track power.

Attachments

Images (6)
  • 2021-03-05 10.32.27
  • 2021-03-05 10.32.16
  • 2021-03-05 10.32.08
  • 2021-03-05 10.31.46
  • 2021-03-05 10.29.57
  • 2021-03-05 10.29.44
×
×
×
×
×