I was able to get my engines to run nicely over the two switches leading to the long sidings.  The only problem was that I had forgotten to make a power connection to the left hand siding.  That was quickly remedied, but I didn't have a chance to test it out until last evening.

2021-09-05 16.42.432021-09-07 23.14.49

Now it's time to get on to the next project.  Should I wire in the DZ1000 switch machines or the power drops to the AIUs first?  I'm thinking the power drops, so I can easily turn off power to sidings that are holding engines not in use, instead of having to lift wires.  I can do all that seated on my rolling stool, whereas I need to bend under the layout to get wires connected to some of the DZ1000 drops.  That would let my lower back get a little better first.