Skip to main content

Reply to "Blackwater Canyon Line - March 20, 2025, Brick Street Extension Planning"

@Mark Boyce posted:

Another problem is that I have the small river running from removable section to section.  Hiding seams with foliage, rock, or buildings isn't as hard as a seam across water.  I could make the river attached to the layout, but it is in the rear of the sections.  Also, there is one wire drop from the track to the #14 wire to the panel along the rear track.  If I made the river fixed to the layout, I would have to move or lengthen the drop.  We will see how all that progresses as well.

In all, I find the above challenges more interesting and fun than the challenges we went through wiring all this up. 

Mark- a thought... you could create a small drop in the creek at each joint and cover the seam with rocks that overhang and hide the seam. A small waterfall, weeds, and brush would cover the remaining gaps.

Bob

×
×
×
×
×