Skip to main content

Reply to "Blackwater Canyon Line - March 20, 2025, Brick Street Extension Planning"

Thank you, Andy!

Here is the 'uppermost' section with an extra 1" piece of Styrofoam glued to the underside.  That makes a 1" fall in the river right at the joint.  It gives me a rough idea of what I could do at the seam.  I don't know if the river will be that wide when done, but I gave myself room for a rocky bottom and banks.  As far as lifting it out of position. I can always reach under the layout, and push them up, then grab them from above.  I thought it would be neat to have something to lift them right out standing up straight.  The way I have been going, I don't want to have to get under the layout when I am feeling my worst. 

2022-02-19 19.31.152022-02-19 19.31.51

On a side note, I worked on the upper lift up bridge to get a better alignment in the down position.  I had settled for it coming to rest about 1/16" off in the pocket I made with wood blocks.  I had been nudging it over with my hand to give proper track alignment.  Now it falls right into place.

Attachments

Images (2)
  • 2022-02-19 19.31.15
  • 2022-02-19 19.31.51
Last edited by Mark Boyce
×
×
×
×
×