Skip to main content

Reply to "Blackwater Canyon Line - April 2, 2025, Brick Street Extension Planning"

@Mark Boyce posted:

I finished the supports and removable top for the station site.  Here are the supports that will be exposed when the top is removed.  I made them so there is plenty of overhead room for the hand operated staging track below.

2022-03-26 17.34.33

2022-03-26 17.34.24

2022-03-23 13.01.58



Mark- The station is looking good. I like the platform too. I see that this view matches the photo, but I'm sure you'd rather have the tall side facing you when you enter the room. What's your thought?

Removable panels on the lower level would work. I did a simple one on the face of the wall for my upper level. It's held in place with a couple velcro dots. I have wiring hidden behind and can reach into the tunnel if I need to retrieve a wayward car. The long panel on the right side comes off. I hid the seams with the columns on the corner and on other end. All of this is paper prints mounted to cardstock.

Bob

2016-03-27 21.22.402016-03-27 22.04.03

2017-02-21 07.00.34

Attachments

Images (3)
  • 2016-03-27 21.22.40
  • 2016-03-27 22.04.03
  • 2017-02-21 07.00.34
×
×
×
×
×