Skip to main content

Reply to "Blackwater Canyon Line - April 2, 2025, Brick Street Extension Planning"

Thank you Andy!  Yes, I think a summer of acquiring the details for the three buildings will work nicely to ready for some winter 'interior decorating'. 

I did make a foundation base like David Eisinger did for his.  1/8" sheet styrene on top of 1/8" x 1/8" styrene stock.  I cut strips of the stone embossed plastic that came with the kit and glued them on the edges of the foundation.  When I positioned the building back on the foundation, I realized I had made it a smidgeon too long, even though I had checked it before gluing on the stone.  Typical for me.    So I shaved off the stone and some of the styrene, then glued another strip on the end. 

Well today we have had snow, sleet, rain, hail, and sunshine, all more than once!  There is a crew of roofers at a house down the road who are pulling their tarps off before they get them totally in position.  They have gotten a lot done however.  I only took the dog for his morning walk and car ride.  Otherwise, I'm staying in and going back to the layout.  This seat is starting to hurt again. 

×
×
×
×
×