Skip to main content

Reply to "Blackwater Canyon Line - April 2, 2025, Brick Street Extension Planning"

Thank you Jeff and Bill.

Jeff, is this the view you are looking for?

6DC5F06B-A9E1-4D52-B19E-0CC35449D1A8

I agree about the operating accessories, they don’t fit here either.

I agree with you both it would be neat.  The switch that would be moved is 13-1/2” long.  The straight section on the other side of the bridge is 5” long.  That leaves 8-1/2” to move the upper loop back track.  It would fit with little clearance, but overhang would be in the open window except one spot.  I would actually have better clearance to reach the switch under the track.  I am still thinking of moving the town to the upper level with a lift out section.



DAB6AECB-5A51-4163-B113-6417AC4950E1

Incidentally, I have been painting the station chimney as well.

Attachments

Images (3)
  • 6DC5F06B-A9E1-4D52-B19E-0CC35449D1A8
  • 99ED6E1C-40EF-4B16-A088-B2E03A41FBF3
  • DAB6AECB-5A51-4163-B113-6417AC4950E1
Last edited by Mark Boyce
×
×
×
×
×