Skip to main content

Reply to "Blackwater Canyon Line - April 2, 2025, Brick Street Extension Planning"

I finally got all the snowbirds on the station.  I opted for one row on each roof surface as the prototype photographs show as opposed to two or three staggered rows.  Here are a couple photographs, one a closeup.  I'm happy with them.

2022-05-29 15.22.21

2022-05-29 15.22.09

I'm going to leave the station project for now until I get the parts I want for the interior.  Next up is some cleanup of the shelves underneath the layout and making a space to store the double track bridge until I get the plan ready for the changeover.  The way it is now, I could bump into it.  I changed out a bad DCS remote thumbwheel carriage in my original remote.  Before that, I backed it up and loaded the information on the spare remote I bought last year.  Now both are up to snuff.

Attachments

Images (2)
  • 2022-05-29 15.22.21
  • 2022-05-29 15.22.09
×
×
×
×
×