Skip to main content

Reply to "Blackwater Canyon Line - April 2, 2025, Brick Street Extension Planning"

@Mark Boyce posted:

Thank you, Dave!  The roads will all be dirt and asphalt with a lot of parking areas gravel.  Don't ask me what methods I will use.  I don't even remember what methods I used on the last layout. 

It rained a lot today, so I got some work done on the layout.  The Homasote and cork roadbed is in.  The alignment at the end of the curve works out just right, but it was 1/4" tight by the time it got to the bridge.



I'll have to make some adjustments to the stops on the slide in station module, but here is a rough idea how it will go.  Anything that looks out of kilter is an optical delusion. 

2022-07-05 19.40.44

I ran an engine around and discovered something isn't making contact at the lower bridge.  I see the problem, but decided to fix it another day. 

Looking good Mark! Just wondering have you tried the switch line up coming from in front of the station to the other loop to see how things look?

I kind of used that as a gauge to set my track as needed.

×
×
×
×
×