Skip to main content

Reply to "Blackwater Canyon Line - April 2, 2025, Brick Street Extension Planning"

Thank you, Andy!

Yes, there is a lot packed into a small space.  It stopped raining and was reasonable to work outside the last few days, plus I had other jobs and a couple doctor appointments, so I didn't get much more done.  I am actually to the place I could put the double track bridge in place.  I will have to remove the one of the mounts for one hinge and a guide on the opposite end where the bridge end drops into place.  Since I'll be doing more outside, I don't want to take the bridge our for an extended period of time.  I'll work on some other things when I get a little time for now.

×
×
×
×
×