Skip to main content

Reply to "Blackwater Canyon Line - April 2, 2025, Brick Street Extension Planning"

Thank you, Andy, Bob, Rich, Bill, Dave, Richie!!

Yes the bridge does reach up high.  I had to make sue the limit switch was set to allow it to go as high as possible so it didn't crowd the aisle but not hit the ceiling.

Dave, I didn't get much of anything done but false starts until I was close to retiring.  It certainly got frustrating at times.

I didn't do much today except I took the track and walkway off the Atlas double track truss bridge to get it ready for painting since I bought it already built.  There were small screws that held the track on from the underneath.  Here is the bridge upside down with the track off.  There is really a lot of detail underneath that is visible from the door when the bridge is in the raised position.   I hate to cover that up with wood for stability as the bridge is raised and lowered, so I am thinking of looking into buying some plexiglass like Mike g. used on his.

2022-07-13 13.19.47

Here's the track and walkway sections that I should paint too.  The woodgrain pattern is nice on the plastic.

2022-07-13 13.20.432022-07-13 13.20.12

Attachments

Images (3)
  • 2022-07-13 13.19.47
  • 2022-07-13 13.20.43
  • 2022-07-13 13.20.12
Last edited by Mark Boyce
×
×
×
×
×