Skip to main content

Reply to "Blackwater Canyon Line - April 2, 2025, Brick Street Extension Planning"

Thank you, Andy, Mike, Jay!

I didn’t get it quite as smooth as I would like, but it is pretty good.  The problem was with the roadbed transitioning from level to the grade on the diverting side of the switch.  I shaved some off one place and raised it some another place.  Then I did part of it over again.  A passenger car with 6-wheel trucks handles it fine.  A H9 Consolidation handles it well at speeds well above what I normally run.  Never a hiccup.  I’m too tired to fiddle with a video, so here is a photograph!  😄

5B2AC895-2825-45E6-B474-5C6B89DF96D0

Attachments

Images (2)
  • 928DE6E4-3E70-4C1B-8777-B8B405FD30BC
  • 5B2AC895-2825-45E6-B474-5C6B89DF96D0
×
×
×
×
×