Mike, I’ll take some good photographs after I finish wiring in the last 4 blocks.  Hopefully the wire will arrive tomorrow as scheduled!

I programmed and tested all the new blocks I had wired after PT today.  I also have to wire in the contacts to power the double track bridge when it is lowered.  I can wire in the new DZ1000s after I have trains running.  I need to come up with a couple panels for the DZ1000s and rewire all the push buttons when I do the new ones.

×
×
×
×
×