@Mark Boyce posted:

Thank you, Mike!

I didn’t do much more, but got thinking of how I am going to scenic both ends of this upper level.  Two multi-track tunnel portals of some sort would be in order.  Here is a foam board mock up of one on the right.  Scenery in the form of a hill with a road will be to right of the portal.  I suppose I could extend a fascia of stone to the left of the portal to cover the open area to the left of the portal.  Something to consider.

IMG_6742

I’ll address the left side under the Sanky Wanky Coffee building and bridge in the days to come.

Mark,

You’re rattling my cage here, I’ve thought about closing up this space but haven’t come up with a plan; with three track clearances and the elevator track. Every time I look at  I get distracted. IMG_2563

The only shot  that I have of the other side isn’t very helpful. The local track is in front of the garbage truck. The two mains are to the right of the building. There are actually 3 tracks because the outside main splits in two just behind the garbage truck  IMG_1136