Skip to main content

Reply to "Blackwater Canyon Line - March 20, 2025, Brick Street Extension Planning"

Mark, I was watching an HO guy add scenes to his extensive layout and liked what he was doing when adding buildings to various scenes.  He used heavy poster board thoroughly coated with primer on both sides as a base for his buildings including side walks. He sanded the areas where the building pavement met the street creating a smooth transition. I am a big fan of being able to work on the areas off the layout and then place them as needed. The modeler is Jason Jensen. check your email.  Jeff

×
×
×
×
×