Skip to main content

Reply to "Blackwater Canyon Line - March 20, 2025, Brick Street Extension Planning"

Thank you, pennsyfan Bob, RSJB18 Bob, Steve!

@pennsyfan Bob, thank you for confirming I was right about what you meant.  I like your suggestion for the upper road.

@RSJB18 Bob, thank you for giving a 3D mock up of your suggestion.  I mocked up something along that lines.  One problem I have is that I want the road making the grade crossings and off the front of the layout to stay to the right of the switch points.

20250323_190518123_iOS

20250323_190534118_iOS

20250323_190611673_iOS

The far right end of the right hopper is at the end of the area for the farm scene. 

20250323_190720349_iOS

I then mocked up Steve's suggestion.

20250323_191730168_iOS

20250323_191738847_iOS

20250323_191756983_iOS

My rendition of Bob's suggestion took up about 6 more inches than how I did Steve's.  That doesn't mean I am going with Steve's.  I will have to ponder it for a while and maybe try some other things. 

What is that mess underneath the layout????  Someone should put curtains or something so it isn't so distracting!!! 

Attachments

Images (7)
  • 20250323_190518123_iOS
  • 20250323_190534118_iOS
  • 20250323_190611673_iOS
  • 20250323_190720349_iOS
  • 20250323_191730168_iOS
  • 20250323_191738847_iOS
  • 20250323_191756983_iOS
×
×
×
×
×