Skip to main content

Reply to "Blackwater Canyon Line - March 20, 2025, Brick Street Extension Planning"

John,

Here are a couple quick thoughts while I am on break.

I am really hoping to run my H9 Consolidation which takes 042 curves.  I realize expanding the curves to 042 stretches the canyon loops out into the middle of the room.  However I got to thinking, I don't need to provide for continuous running on this layout.  If I want to do that, I can just step through the door and run trains on the Ceiling Central RR.  So, besides some sidings, buildings, and wye/turntable at each end, I don't need room for a turning loop.

Do you think this idea would work?

Marc Williams really wants to see that H9 I got from him on a trade run on this layout.  

Right Marc?  ;-)

Oops, gotta go for now!

×
×
×
×
×