Skip to main content

Reply to "Blackwater Canyon Line - March 20, 2025, Brick Street Extension Planning"

Well, after that one warm day we had, the snow is gone.  Since it is in the low 30s, I decided to do a few odd jobs outside I normally do in November, and take down Christmas wreaths and lights.  As I was on the patio, I decided it would be a good idea to take a photo of the doors outside so you can better visualize what I am talking about.  First is where you can see the addition in white vinyl siding with the infamous glass sliding door.  The door on the tan brick and aluminum siding part is where the sliding glass door originally started and continued into where the addition went.

2017-01-14 14.16.45

I am now inside sitting at the desk right beside the newer 36-inch door.  Here you can see where the sliding glass door was taking the space of the 36-inch door, a pillar, and the 20-inch wide entrance to the train room.  Part of the Ceiling Central RR is above.  Also, you can see on the left where the laundry is and the window through the brick wall. Beyond the washer and dryer is the firewall separating the living space from the garage, so there is nowhere else to move the laundry.  As you can see in the train room with the single three-bulb fixture, my outside work is not complete as I have power cords and part of the Nativity I need to box up and put in the attic.

2017-01-14 14.44.24

Attachments

Images (2)
  • 2017-01-14 14.16.45
  • 2017-01-14 14.44.24
Last edited by Mark Boyce
×
×
×
×
×