Skip to main content

Reply to "Blackwater Canyon Line - March 20, 2025, Brick Street Extension Planning"

I scanned those preliminary plans for my proposed HO layout back in 2001, just to show I had been thinking along these lines back then.  This layout was to have staging for Elkins and Cumberland.  Elkins was to be on a lower level, and Cumberland on the main level.  There was to be a steep run to an upper level for the Chaffee Branch which veered off between Thomas and Cumberland.  Yes, it is crude, and certainly not final.  In fact, I recall thinking I would move the Thomas yard over towards the curve to allow more room for the Blackwater Grade.  I hadn't decided on all the sidings etc. either.  However, one can see this plan was point to point, just like John's is now.

I had built a bunch of benchwork, and before putting risers for elevations, I had placed sheets of Styrofoam on the benchwork to try out the track to see how it fit.  Eventually, I kept taking up track and we ended up building 2 dollhouses and other projects for the girls on it.  Then it seemed to become a catch all for stuff my wife put there.  Eventually, I took it all down, and used the lumber and foam for various home projects.  Such is life.  And now we have come to where we are today.

Attachments

Last edited by Mark Boyce
×
×
×
×
×