Skip to main content

Reply to "Blackwater Canyon Line - March 20, 2025, Brick Street Extension Planning"

Jhainer posted:

just a thought in one of the pics you showed the ceiling layout running over the door to the train room . couldn't a helix be put in to tie bot the ceiling and the room layout together so you could transition between the two just  a thought .

It is a thought I had too.  I do intend to rework the shelving of the corners of my ceiling layout regardless of what I do otherwise.  With that, I could make a ramp into the train room at the upper corner of the door.  John C's opinion that overhead trackage could distract from the main layout, is a good point too.  I think the helix could be done.  I just need to think about that; and maybe leave provision for something like that in the plan for a future possibility after the main layout is well on it's way.

Thank you for the idea.

×
×
×
×
×