Skip to main content

Reply to "Blackwater Canyon Line - March 20, 2025, Brick Street Extension Planning"

Dave,

You are correct on all counts!  I realize I will need steep grades and level areas for the switches.  The prototype is steep, and I'll be running short trains.  I have never used curved switches before, even in HO.  Straight ones would be less expensive as well.  Yes, I have bent GarGraves before for a little jog in one wall on the Ceiling Central, and yes it is a bear!  I am up for it where necessary however, and I realize the yard and turntable area will need it. 

As to longer trains, I already started refitting one corner of my Ceiling Central RR with 072 to run them.  I agree with John C that trying to fit an upper loop for them in the adjacent train room would be just too much!

Thank you for taking a look.  I hope the train show in Phoenix was good!  Enjoy the weather.  It is 14 degrees here.

×
×
×
×
×