Skip to main content

Reply to "Blackwater Canyon Line - March 20, 2025, Brick Street Extension Planning"

Wow Dave, you are up and at it early; Mountain Time I think!  I see the changes.  You have packed a lot in!  Yes that does include everything from the original plan except using a loop at one end instead of a turntable! The prototype had a grade a bit over 3%, so no one could argue it isn't prototypical; as if I care what someone would say about that.  I was thinking of trying my hand at some rough sketches to see how I would scenic all these, way back to John's original concept.  Much to ponder!  Thank you!

×
×
×
×
×