Skip to main content

Reply to "Blackwater Canyon Line - March 20, 2025, Brick Street Extension Planning"

Yesterday while taking breaks from winter leaf cleanup and getting the mower running, I laid out my GarGraves track on the floor in an approximation of how the plan flows.  It is not exact, because I just laid pieces overlapping where there will be track cuts, and I did not bend any of the flex to shape.  I used some 054 and 072 I had on hand to simulate the bent track.  I also only have 4 of the 9 switches, so only one is in place.  I also left the staging sidings out.  Here are a couple of photos of how the track will fill the space.  Not too bad.  I think I can live with this as long as I make the layout high enough to get my increasingly arthritic body under and into the access hatches.    Sorry the room is so small I couldn't get a complete view. It was too windy or I would have opened the sliding glass door.  I didn't want dried leaves and maple blossoms blowing in.  I think you get the idea.

2017-04-08 20.34.412017-04-08 20.35.03

Attachments

Images (2)
  • 2017-04-08 20.34.41
  • 2017-04-08 20.35.03
×
×
×
×
×