Skip to main content

Reply to "Blackwater Canyon Line - March 20, 2025, Brick Street Extension Planning"

I made some more exact measurements and some adjustments.  The doorway at the top is actually 96" from the left hand wall.  I think we can live with the curves out in the 36" walkway.  I made adjustments in the lower left, getting rid of the S curves, and making a walkway next to the wall.  I can now reach that town by both sides, so it can be stationary.  The green yard does protrude out from the wall far enough that I wouldn't be able to reach the far tracks at the bottom.  Maybe removing a track from the yard would help.  I have an overlap of the track in the lower right, I haven't figured out how to cut and fit yet, nor adjusting the track heights.  Also, I lost the Capture feature, so here is a cut and paste and post this for comment.  I did include the new SCARM file. Thank you.

Attachments

Images (1)
  • mceclip0
Files (1)
×
×
×
×
×