Skip to main content

Reply to "Blackwater Canyon Line - March 20, 2025, Brick Street Extension Planning"

Really enjoying all the iterations to this layout!

This may have been suggested before but is there enough room to start the yard lead at the tunnel entrance and slope it down so the yard can be located below the passing siding? And maybe even below the loop on the right?

×
×
×
×
×