Skip to main content

Reply to "Blackwater Canyon Line - March 20, 2025, Brick Street Extension Planning"

Thanks Mark.  All I can tell you is that my own Hidden Storage Yard sat under the left side of the layout and was reached by a long, long, long (18') yard lead that ascended across the back of the layout to the steel mills on the right hand side.  The lead was designed to be disguised by part of the backdrop (WHAT was I thinking????        .

It was a major PITA to build and practically impossible to operate.  The yard had 5 switches, all difficult to reach, and all (predictably) had switch machine issues at some point in time.  Murphy's Law - in full effect.

George

Last edited by G3750
×
×
×
×
×