Skip to main content

Reply to "Blackwater Canyon Line - March 20, 2025, Brick Street Extension Planning"

Mark 2018-06-07

John, Yes that is a good idea.  I won't have a lot of hidden track, but there will be on both the upper and lower 042 turnback loops in the upper left of the plan.  This drawing has the lower alignment right under the upper level, but I don't expect it to work out exactly that way.  I will have the town of Thomas over this area which in real life is located on a hillside.

Attachments

Images (1)
  • Mark 2018-06-07
Last edited by Mark Boyce
×
×
×
×
×