Skip to main content

Reply to "Blackwater Canyon Line - March 20, 2025, Brick Street Extension Planning"

Thank you, Chris!  I hope to get started soon, although to be realistic, it may not be until January.  I am going to take the table top off the roll out section I built in the little room, and turn it 90 degrees on the roll out to work for the lower level of the turn around in the upper left.  I ordered a benchwork kit from Mianne for the section along the left hand wall.  I can do the rest of the benchwork with two more Mianne kits later when funds permit.  I decided to go that route after building the roll out, and having  a knee that will need replaced in a couple years and back and sciatic nerve problems.  Carpentry isn't my specialty, and I decided I should make that part as easy as possible.

I have been thinking of writing some more ideas, but will get to that later.

×
×
×
×
×