Skip to main content

Reply to "Benchwork - Wiring - adding elevations"

It has been a while since last updates, so this is what has been going on. I have finalized, tested (without track or trains) remote control of power blocks, turnouts and remote occupancy detectors all installed in layout. I have defaulted the mainlines to all power up with initial power being applied. Spurs, yard, whisker tracks are defaulted off requiring a command to turn those on individually. Turnouts are all defaulted to straight thru and need activation for turning. Since I think I have done as much under table work from above as I could, it is time to lay some track to get at least one mainline working to test electronics and see how I like the layout. I will just be putting it directly on the plywood and no elevations yet. just a test and get the feel for how things work. Any advice is MORE than welcome.

×
×
×
×
×