I built a lift bridge walk-through to access the center of the layout I am building. It consists of a wood base with an Atlas double track truss bridge mounted on top. I am in need of a means of achieving an electrical connection to the tracks upon contact when the bridge is in the lowered position. Anyone have any practical ideas? Input would be greatly appreciated.
Phil