Skip to main content

Reply to "Paint Creek Railroad"

I extended the grade in order to lower it below the upper layer by 2".  The only requirement I had was to maintain a 6" separation between the grade and the entrance to the staging.  I don't know what the drawbridge needed in the way of vertical separation of the tracks.

Jan

basement train 760_054_2 Jav V2

Attachments

×
×
×
×
×