Skip to main content

Reply to "PRR Panhandle 2.0"

Updated 8/7/2021:

Didn't get much building done today as our attention was diverted by the Beaver, PA car show.  But I am doing some thinking about the following items:

  • Will finally need to attach the Central Switch Bus (#2) to the layout.  It drives Switches #33, #34, and #35.
  • Originally #35 was meant to be paired and thrown with #10.  That is out the window.  They are too far away for that.
  • I am debating how or if to signal the Weirton Steel Yard, hence the thread on PRR yard (dwarf) signals.

More when I know it. 

George

×
×
×
×
×