Skip to main content

Reply to "PRR Panhandle 2.0"

Updated 3/8/2025:

We are inching along.  Large vertical pipe (I don't know what it was for, but the prototype had it) got installed.

IMG_9986IMG_9988

I have one more vertical wall to cut on Pouring (left) side.  That large opening will get a strip across the top, providing a spot for a few more pipe supports and the continuation of the yellow pipe.  The hole will remain large enough to allow the interior to be seen.  After that we'll touch up the paint and apply weathering to the whole she-bang.

More when I know it. 

George

Attachments

Images (2)
  • IMG_9988
  • IMG_9986
×
×
×
×
×