Skip to main content

Reply to "PRR Panhandle 2.0"

@G3750 posted:

Thank you, @luvindemtrains Dave!  The yellow piping (1/4" Plastruct TB-8) is being held with SC-8 pipe clips (on the left in the photo below).  The other items are 3D printed railings for the Crawford's Crossing overpass project.

IMG_9916

George

Thanks George but that clip on the left doesn't look like what you have the yellow piping secured to the building with.

Dave

Last edited by luvindemtrains
×
×
×
×
×